Re: How will IBP complement APO?

Hi ArvindInitial stage IBP demand solution could along with SAP APO.IBP demand could work together with SAP APO DP where you can transfer APO DP data to IBP demand solution for advance features like...

View Article


Assembly Scrap is not getting considered in SNP planned order.

Dear Gurus, In our scenario we want to consider assembly scrap for a Finished good. Thus in Product master assembly scrap is maintained. The necessary setting in global SNP customizing is also done....

View Article


Re: Assembly Scrap is not getting considered in SNP planned order.

Hai ashwani, Just check is you maintain assemble scrap % in MM mrp1 tab ? after that go to  MM costing 1 tab, there under  costing lot size option. Under the option we should maintain the enough...

View Article

Re: Assembly Scrap is not getting considered in SNP planned order.

Hi Prudhvi, Scrape % is maintained in MM mrp1 tab and same is cifed to APO, also did the changes mentioned by you in costing lot size. still same result planned order quantity is not considering...

View Article

Re: Planned order conversion issue in APO due to storage location of components

Hello All: SAP released the following two OSS notes 808891 recently( APO->R/3: Material not maintained for storage location) and 808698(APO->R/3 Checking component storage locations). These 2...

View Article


Re: Assembly Scrap is not getting considered in SNP planned order.

Hi Ashwani, Assembly Scrap does not necessarily increase the Planned Order Qty to the produced. Try using lot sizes and you will be able to see the reduction in Planned Orders but the total sum of...

View Article

Re: Assembly Scrap is not getting considered in SNP planned order.

Hai ashwani, Better to use procurement type 'x' to your FG. Assemble scrap  it increase volume of qty and hours .

View Article

Considering only stock with shelf life more than 6 months for planning

Considering only stock with shelf life more than 6 months for planning. Business is not willing to move the stock with less than 6 months to a different storage location. Total stock available at a...

View Article


Issue in displaying the outlier alerts in DP planning book

Hi Experts, I am experiencing an issue in displaying the outlier alerts in DP planning book. System is throwing ABAP run time error(TIME_OUT) after executing for one hour. I have checked alert table-...

View Article


BOM Integration model for E50 and with expired version

Hi all.It seems not possible to create a PDS (from BOM) in case the material has only expired production versions (MM03) and has procurement E-50.  Our need is to keep the versions expired (for future...

View Article

Re: Issue in displaying the outlier alerts in DP planning book

Hi Can be please provide the ABAP dump message or screen shot from T-code ST22.Plesae check if you still have many entries in Alert tables. Please use report /SAPAPO/AMODAL_DELETE to delete data based...

View Article

Re: Considering only stock with shelf life more than 6 months for planning

Hi UjjalI think this is the standard requirement in food or pharma industry. It´s not possible in the SAP standard solution but you require to come up with work around. In my earlier project, we use to...

View Article

MAT time confirmation

Dear Experts    How the availabilty of material time is calculated in Block Planning .As i am getting availabilty date as end of block + Gr  it is ok .  But availabilty time I am getting as 4 hours...

View Article


Re: User Exit / BADI to validate on save in /SAPAPO/MAT1

Hello Phani,have you solved your issue? RegardsSebastian Szczerba

View Article

GR Receipt Time

Hi Friends, GR receipt time is mentioned as 20 in product master. I changed it to 22 in planned order manually using MD12. But somehow the value reversed back to 20. I checked in table PLAF and found...

View Article


Re: Issue in displaying the outlier alerts in DP planning book

Hello, I have checked the ABAP dump and error is time limit is exceeded as the program /SAPAPO/SAPLMCPSH_SEL is exceeding the max.runtime. The current setting of runtime system profile parameter...

View Article

Image may be NSFW.
Clik here to view.

Characteristic description/text is wrong

Hello Experts, One of the characteristic value displayed in RRP3 is displaying wrong text.We have not maintained any description for that characteristic value in CT04 but really do not know from where...

View Article


Re: Characteristic description/text is wrong

Hi Menka  In the above screen shot is it requirement or receipt . check for product master whether same charcterstics are displayed in classification view . Reagards Virender

View Article

Re: Characteristic description/text is wrong

Hi Virender, Thank you for your reply.These are requirements.We do not maintain any values in product master instead we determine by a our logic what value should come. Thanks,Menka

View Article

Re: Characteristic description/text is wrong

Hi Menka Check whether any object dependency is created for that charcterstics.and cif once again your charcterstics to APO RegardsVirender