GR Receipt Time

$
0
0

Hi Friends,

 

GR receipt time is mentioned as 20 in product master. I changed it to 22 in planned order manually using MD12. But somehow the value reversed back to 20. I checked in table PLAF and found out the timestamp with change user as ALEREMOTE. I couldn't find any batch job running during the time mentioned in time stamp both in ECC as well as APO.

I want to find out what caused this change.

 

 

Thanks,

Atul