Re: Assembly Scrap is not getting considered in SNP planned order.

$
0
0

Hai ashwani,

 

Just check is you maintain assemble scrap % in MM mrp1 tab ? after that go to  MM costing 1 tab, there under  costing lot size option. Under the option we should maintain the enough quantity of lot size .

 

Ex : If you are maintain 2% assemble scrap , then  you should maintain costing lot size option 50 pc  . Then the assemble scrap is working properly.