Considering only stock with shelf life more than 6 months for planning. Business is not willing to move the stock with less than 6 months to a different storage location.
Total stock available at a given product location in ECC = CC
Batch data to be picked up and stock quantities to be identified with remaining shelf life less than 6 months(ZS).
Objective: For SNP planning instead of total stock use(CC-ZS)
Can this be achieved in SNP Heuristic or deployment?