Hi all.
It seems not possible to create a PDS (from BOM) in case the material has only expired production versions (MM03) and has procurement E-50.
Our need is to keep the versions expired (for future "reactivation") and manage the spec. procurement field, rather than delete them. We are facing the problem that the CIF of BOM do not consider them (we added the BOM key to the method PDS_IMO_SELECTION of the BAdI for the return table CT_MBOM_KEY, as suggested into this note).
It seems that the system considers only the "absence" of any version in order to create the PDS from BOM, not the validity neither the Procurement and Spec.procurement.
We expected that the system considers the procurement first of all.
Is this the right behaviour? Does anyone faced this issue?
There is a workaround?
Thanks.