Quantcast
Channel: SCN: Message List - SAP Advanced Planning & Optimization (SAP APO)
Browsing all 2032 articles
Browse latest View live

Re: SAP APO EHP upgrade

Hello Naveen, SPDD and SPAU activity would highlight the list of objects that has the deviation. 1. Please check with your team if there is any instance where you had added includes into FORM ROUTINE...

View Article


Re: Planning version not found

Hi Jaisree, What version you're using Active 000 or any simulation Version. Check the CTM Profile. Check whether the version which you're using in the job is available in /sapapo/mvm. Check the variant...

View Article


Re: Planned Order Created in SNP has different dates in APO and ECC

Hi Bhavesh, Switch off detailed scheduling in ECC for planned orders i.e check in planned orders the detailed scheduling tab should not be visible.Also check the above solution to incorporate NDS...

View Article

Re: Planning version not found

Hi Vinoth  I am using only active version  every thing  is correct in variant .sometimes only it is getting Planning version not found. Thanks & Regards Jaisree

View Article

Re: Incorrect Fixed duration in SNP PDS

Hello Sanjog, How did you resolved the issue?  We have a similar issue.   Duration is 80 hours fixed in ECC master receipe.    Resource is available for 8 hours per day, which means 10 days fixed...

View Article


Re: Planning version not found

Hi  Check no other job is running while you execute this. If there is a locking situation it might result into this. Also check KBA 1821199 for lock entries and table status. 1821199 - Background job...

View Article

Re: TLB - heuristic creates STOs without considering the issue SLoc

Hi Pilvi, I get your point now. Make sure all the storage locations are in APO, this can be done by CIFing MRP Areas from ECC to APO.  Make sure the Tlanes are set up between the "Issuing Storage...

View Article

Re: Incorrect Fixed duration in SNP PDS

Hi Bhavesh You are mixing two master data's which would be used as combinations. 80 hours fixed in recipe means that this phase will take that much time. Therefore it is shifted as 4days. On the other...

View Article


multi-level allocation on different allocation groups

Hi, I've used multi-level allocation but couldn't achieve the desired behavior. Question:is it possible to have something like a hierarchy with a direct relationship between the hierarchies in...

View Article


Run SAP Like a Factory (RSLAF) & APO related Alerts

Hello, Before implementing custom logic to handle alerts automatically in SAP APO, I would like to know if there is any standard Run SAP Like a Factory alerts for SAP APO which could be streamlined for...

View Article

Re: TLB - heuristic creates STOs without considering the issue SLoc

Hi Pramod, the issue is that we don't use mrp areas, we do not plan on Storage location within one plant. we have one SLoc directly in the factory from which a few distribution centers are served, but...

View Article

ABC/XYZ classification

Hi, can anybody of you explain the ABC/XYZ classification in detail? I wonder why it isn't possible to create more than one planning level for one planning area. Because sometimes maybe I want to...

View Article

Image may be NSFW.
Clik here to view.

Com Error 40025

Hello community, I'm using SCM 7 ehp 2.In transaction /sapapo/dp94 I get com routine Error 40025.I ran the livecache consintency check, but it said everything is fine.Ay hints for me ?Best regardsBastian

View Article


Re: Com Error 40025

Hi Bastian Check SAP note depending upon what you are doing in planning book. 1352371 - Interactive Forecast - COM error 400251323632 - /SAPAPO/SDP94: Errors during drill down/drill upLet us know if it...

View Article

CTM Performance Improvement

Hello Gurus,  Currently we have the standard setting for Live cached Accesses , 50- creating orders, 5000- Creating pegging and 50- Order Selection . We want to improve our performance so wanted to...

View Article


Re: CTM Performance Improvement

Hi Nick Refer below SAP notes.  1379526 - CTM Engine: Performance855229 - FAQ : Capable-to-Match (CTM) planning1810614 - Skipping of Multi-Level Supply and Demand Mapping StepI hope it helps you in...

View Article

The Different Day's Supply(Cfmed) between two SNP Planning books

Hi Our company is using the SNP as the planning tool for our daily planning work. But currently I'm confused by the day's supply(Confirmed) gaps between Planning book:[Live] SNP DC...

View Article


Re: Com Error 40025

Hello Rahul, both notes are for SCM 7.00 but we have SCM 7 with ehp 2.So both notes could not be loaded into the system. Regards,Bastian

View Article

Re: SPP - DRP -New Sales order type not appearing in DRPM

Hi, Pls check this.. From SAP Library. Believe you've to make additional settings in customizing of SPP. Information about the Document Type Characteristic - Generating the Demand History - SAP Library...

View Article

A newer version of data type /SAPAPO/MATRQS_I was found than one required

Hi All, We are getting below error when transferring data to APO. A newer version of data type /SAPAPO/MATRQS_I was found than one required All material Master queues are failing. Anyone faced such...

View Article
Browsing all 2032 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>