Hi,
can anybody of you explain the ABC/XYZ classification in detail? I wonder why it isn't possible to create more than one planning level for one planning area. Because sometimes maybe I want to execute the classification e.g. on plant level and sometimes on Sales Org level.
So why isn't that possible?
In addtion I want to have addtional classification within ABC e.g. like D for new products or anything else. The D should always be assigned to a product when I have less than 6 monthy history and the product is e.g. marked as phase in.
So how I can implement that?
Futhermore I want that the result from the report "/SAPAPO/ABC_XYZ" will be transferred to my attributes in the planning area. Has anybody done that and give me some comments or hints?
thx
Maike