Re: What is difference between /SAPAPO/PEG1 and /SAPAPO/RRP3..?

Hi Brahmankar, Thanks,I want to know why there two separate t-code for same purpose.   Thanks and regardsNarwdeshwar

View Article


MoT not assigned to T-lanes created via CIF

DearDoes anyone know this case: We create Transportation lane via CIF from Purchase infor record,but there is no Means of transport in TL.And I found SAP Note No. 1383431....

View Article


Optimizer plans safety stock for distribution demand doubling safety cover

Hi  We have a situation that is easy to solve using standard MRP but we are struggling to find a solution for in the SNP optimizer and I'm hoping someone here may be able to help.  We have a...

View Article

Multiple ECC system integration with one APO system

Dear All, We have a scenario where we need to integrate multiple ECC systems with single APO system. All ECC system have same material codes but different location codes. As there are different ECC...

View Article

Re: Multiple ECC system integration with one APO system

Hello Dharmesh,  A BSG can consists of more than one source systems as per design. But if you look at /SAPAPO?MATMAP table the key fields are Client/Product/Product type/BSG and this is linked to the...

View Article


SCM Quota Arrangment Split

Hello I've created on /SAPAPO/SCC_TQ1 a 50/50 split quota for supplier A and B. The behavior i'm getting when we run the SNP heuristics is that for every need we have it create to purch. req, one for...

View Article

Image may be NSFW.
Clik here to view.

Re: SCM Quota Arrangment Split

Hello Joao,  In the Quota Arrangement header this is requirement splitting parameter. Please test by removing the same.  RegardsAbhishek 

View Article

Re: Optimizer plans safety stock for distribution demand doubling safety cover

Hello Andy,  Yes this is peculiar of SNP, not only in Optimiser but also in Heuristic. The Safety Days supply which is specified is for the product location and there no setting similar to " safety...

View Article


Re: Optimizer plans safety stock for distribution demand doubling safety cover

Thanks. I'll have a look into those. Regards  -Andy

View Article


Re: SCM Quota Arrangment Split

Hello I've got the same behavior, with or without the flag. Best regards Joao

View Article

Regional demand plan is not updated in final regional demand plan

While updating regional demand plan the final regional demand plan remain same when I enter RDP for the first time. And when I again Change the RDP then FRDP changes. Is this a system bug or any logic...

View Article

Re: SCM Quota Arrangment Split

That setting is not utilized by SNP heuristics. SNP heuristics will split the demands to the (2) vendors automatically. Are you sure that both vendors is able to meet the demand on time? Put/enter a...

View Article

Image may be NSFW.
Clik here to view.

SAP APO SIDE PANELS WITH ENHANCED PRODUCT PLANNING 713REALEASE

Hello gurus!! We are going to implement the new bussines funtionality with Enhanced Product Planning, however , we couldn’t reach to display the standar side panels when we call the EPP through BWBC...

View Article


Image may be NSFW.
Clik here to view.

Re: Update SDP Relevance using MASSD

Hi,  I have tested and it is working. You should be able to maintain the SDP Relevance with MASSD. Check this: Kind Regards, Mariano

View Article

Re: SCM Quota Arrangment Split

that is what I was telling you.  Heuristics will split demand using the quota regardless of the setting.. That indicator is used by other engines. There is no bug. Ken

View Article


Image may be NSFW.
Clik here to view.

Re: Integration of SD Schedule Agreements from an R/3 4.6c ERP system

Hi thanks for the response, this selection is purely for Purchasing Scheduling Agreements

View Article

Re: Integration of SD Schedule Agreements from an R/3 4.6c ERP system

sales order scheduling agreements should CIF over with normal sales orders.  Is it not working?

View Article


Re: SCM Quota Arrangment Split

It just works at PP/DS level? I'm trying SNP optimizer but only getting Quota arrangement prod_a@plant_a:20160406-20160626 contains redundant items João

View Article

Re: SAP APO SIDE PANELS WITH ENHANCED PRODUCT PLANNING 713REALEASE

Hi Dear R.Brahmankar,Thanks a lot for your reply. I took a look into the note however, the role already has the mentioned changes and even this we couldn’t see the side panels in EPP. Do you have any...

View Article

Production activity cannot be transferred during the PPM CIF

Hi,  We have some production activity that cannot be transferred during the PPM CIF.  When I check the routing, the operation (Base qty) has 7.043 pieces per hour. (I think less then 0,000 hour in...

View Article