While updating regional demand plan the final regional demand plan remain same when I enter RDP for the first time. And when I again Change the RDP then FRDP changes. Is this a system bug or any logic behind this.
This happen for only one material, I matched master data with the material for which this problem is not reflecting then master data is same so what do I need to do to remove this error from the planning book.