Hi Gurus,
We have a new routing setup in R/3 wherein the OP10 and OP20 will have machine time 0.001 MIN.These are the dummy operations which needs to be visible in R/3 and also in APO at FG level. To send these dummy operations to APO above machine time added.But while order creation we are facing issues while scheduling .As per the PDS in APO we can see that for 1 base qty the variable duration is 0.060 sec which is fine.But when we are creating new orders the duration of OP10 and OP20 is much more time than the actual.
I created an order with only one piece and found that at dummy operations the time taken to produce 1 qty is areound 1.07 MIN.This is incorrect.As per PDS it should take 0.060 sec.Please put some highlights on how the operations are scheduled in APO.
Thanks
Debasis Nanda