DB49,
Believe me, I tell them every year.
Since these are scheduled via RSPC rather than SM37, BTCTRNS1&2 don't seem to have an effect. After the client copy, the jobs for every master chain are in Scheduled status rather than Released.
Is there something else basis can do make sure the jobs in the target system are released?
--Jeff