Re: Missing forecast tab in /n/sapapo/rrp3

Ankit, From your APO screenshot, I see a Demand Profile being maintained which does not allow requirements strategy to be overwritten. Please remove the Demand Profile from the Demand Tab and then try...

View Article


Re: /SAPAPO/CURTO 022 : Component assignment 1XXXXX to dynamic setup...

Hello Brahmankar: Thank you very much. This may be the issue that I am facing but would you be knowing the resolution for this. There is an OSS 1464564( BAdI) to influence filter date for obsolete...

View Article


Re: Release Of Consumed Forecast At The Time Of Sales Order Deletion /...

Hi, One suggestion would be to run the report /sapapo/md74 to reorganize requirements/forecast. Hopefully this works for you. RegardsAK

View Article

Re: /SAPAPO/CURTO 022 : Component assignment 1XXXXX to dynamic setup...

Hello Rahul: Thank you for the response. The components are assigned correctly. Although the error message is same as you had pointed out for now I am not seeing materials with leading zeroes but I...

View Article

Re: How to set minimum order quantity for different vendor in APO

Dear both,did that really work?as far as I know the PP/DS heuristic runs in the receiving location (= your production plant), and considers lot sizes from taht Mat-Loc-combination. If you now create...

View Article


Usage of departure time in scheduling for stock transfer orders

Hi expertswe are using transportation lane to schedule the transportation time for a stock transfer order in APO, e.g. for a truck driving between two locations . Works as well  perfectly with a...

View Article

Re: /SAPAPO/CURTO 022 : Component assignment 1XXXXX to dynamic setup...

Hello, There are couple of OSS note on it,1775709 - PDS-INT: Invalid components are transferred2044425 - INT-PDS: Not all obsolete objects filtered outYou can use BAdI CUSLNTRTO_ADDIN which allows to...

View Article

Forecast not getting overwritten instead getting added

When forecast is released from DP to SNP it should overwrite the previous forecast but instead it is getting added each time the forecast is released.So it is showing huge forecast in SNP PB.Forecast...

View Article


Question on downloading MAD values

Hi All, I want to download the system calculated MAD values after the forecast run in APO DP for each CVC for which i run the forecasting. Is there any place where i can check (SE16 tables) and...

View Article


Re: Forecast not getting overwritten instead getting added

Ankit, What do you mean by the one one mentioned in bold? Are you using consumption group etc. while releasing? Check the horizon for which you are releasing and buckets in SNP. Are you checking in...

View Article

Re: Forecast not getting overwritten instead getting added

Hi Rahul, Regarding the queries,  1) There are no conditions maintained while releasing the forecast.I mean that when the forecast is released from DP to SNP both should be matching but here the values...

View Article

Re: Forecast not getting overwritten instead getting added

ANkit, You didn't mentioned where are you checking your forecast in SNP planning book or RRP3? If in SNP planning book, check the buckets for this planning book and compare the same with DP planning...

View Article

How to make a macro run only for Non-Missing cells

Hello Experts, I have to make a macro run only for the cells which have some values, i.e macro should not perform any calculation using blank cells. Ex. I want result as this...

View Article


Re: How to make a macro run only for Non-Missing cells

Harshad, Write this default macro as follows: New macro     New step : ( 78 Iterations : W 35.2015; W 07.2017 )          IF          New condition               Row: Key Figure Price ( Frm  W 35.2015 )...

View Article

Re: How to make a macro run only for Non-Missing cells

Rahul, Thanks for solution this way it is working.

View Article


Re: planned order range

Dear all   Do we can have difference in number of digits in planned order no in ECC vs APO. Because we have 6 digit planned order in ecc where as in apo it is 8 digit number . But my planned order is 8...

View Article

Image may be NSFW.
Clik here to view.

Efficiency and Utilization

In SAP APO, how do you account for efficiency on a resource?  For example, a resource works 24 hours, but they take a 1 hour break and two 15 minute breaks, so the resource is actually running for 22.5...

View Article


Re: SAP APO/ECC Queue

Excellent, thank you

View Article

Re: Efficiency and Utilization

HI Jason Of course both are different but we need to understand that how we need to capture the same and interpret accordingly. In above example you will maintain utilization as 93,7% in resource. This...

View Article

Re: Efficiency and Utilization

The way we measure our production rate here is standard hours earned versus actual hours worked.  We dont measure pieces.  As most of our work takes days to complete.  Anyway, i looked in the hard...