Dinesh,
Just a thought:
You can split the stock into two storage locations in that plant (DC) itself. First Sloc for high priority customer and another Sloc for low priority customer.
- This will split the quantity as per business need.
- You can assign stock accordingly to the customer.
- This will controlled in sales order through storage location thus ATP on this level.
- If you have excess in either of Sloc then you can use from other Sloc also by assigning other Sloc in sales order.
- If you want to check on plant level whether it is possible then you can also check at this level (which means without Sloc) and can deliver to high prio customer from both locations.
DC (Plant) | |
SLOC1 | SLOC2 |
High Prio Customer | Low Prio Customer |
Let us know if it helped.
Regards
Rahul