Hello,
Please help me to understand what/how is populating the field Use Period Factor (REQ_COVER_TYPE) in APO. We have DP and PPDS implemented in APO. In /SAPAPO/MAT1 all materials have set flag on Set Period Factor (sheet Lot Size). We never changed the master data on APO, everything is CIF-ed to APO.
Now we want to remove this flag for all materials. I tested MASS t-code the flag was removed.
Now the questions are:
- how to be sure that this field will not be populated again for the existing materials;
- how to action for new materials? I supposed that this field will be populated as soon as the material will be CIF-ed to APO. How I can managed do not be populated?
Thank you for help,
Valentina