This is the setting I have. OK, I only talk about SNP planned order which is the topic of this thread. So from what you are saying, All i need to do is to change the setting In SCM, IMG > APO > Supply Chain Planning > Supply Network Planning > Basic Settings > Configure transfer to OLTP systems and create/activate integration model. After that SNP Planned order should be in ECC (MD04) as ECC Planned? I am doing it right now. Thanks for all the support, You really are a star!!
↧