Hi Vishnu,
- We add that new product to tlane A-B, B-C, C-D,.... Y-Z.
- We would like to automate adding of product to tlanes as there exists 50tlanes between plants.
If I go with above remark, this means you are assigning material to these locations also in ECC, is it correct? Example material number 12345 will be extended to all locations A, B, C, D.....Z.
If yes then you need to have right "Special procurement key in material master" for each location. Example SPK Z1 - from A to B (assign this in material master for plant B)
Z2 - from B to C ((assign this in material master for plant C)
or vice verse.
Do you see any issue in doing so? Or am I missing something...or is my assumption wrong that you are not extending material master to all locations?
Regards
Rahul