Rahul:
Thanks for the response. The business wants to maintain the data in this way. i.e. The components
have a special procurement key at the production location(FA01) which has withdrawal from another
plant(FP12). i.e the issuing plant
Rahul:
Thanks for the response. The business wants to maintain the data in this way. i.e. The components
have a special procurement key at the production location(FA01) which has withdrawal from another
plant(FP12). i.e the issuing plant