Hello Experts:
I am facing the following issue in SAP APO system. I have finished material A at production location(FA01) which used BOM components B,C and D.
In the BOM for A, the components C and D are maintained at storage location "Sloc1" which is configured for FA01. But in the material master , the BOM components C and D are actually maintained in storage location "Sloc2" which is configured for supply warehouse FA02. During the planned order conversion from APO of finished good A in FA01 , I get the following queue error
"Material C in Sloc Sloc1 of plant FA02 not maintained"
"Material D in Sloc Sloc1 of plant FA02 not maintained"
Has anyone else faced this issue ?
Thanks