Dear gurus,
I'm currently trying to set-up a matrix in APO. Herefor, I have done the following steps:
1) Created 9 setup groups SG(A), SG(B), SG(C), etc.
2) Created setup times for all the above combinations.
3) Assign the setup group to operations in a ppm.
4) Assign the setup matrix to the resource.
Above steps are functioning, the matrix is working on the resource. However....
Is there a easier way to assign the matrix to a material number?
The problem is I have to assign the group manually in each materials' PPM, and we have a lot.
I prefer the times to be derived from SAP ECC and CIFfed to the PPM accordingly, without manual changes to the PPM.
Are there any options to do so? I've been browsing to many documentations, but I can't find any more information.