Quantcast
Channel: SCN: Message List - SAP Advanced Planning & Optimization (SAP APO)
Viewing all articles
Browse latest Browse all 2032

CIF of Phantom BOM which also has a Production version

$
0
0


Hi All,

 

My client uses Phantom BOM's which is also produced sometimes and hence has a Production version (BOM +Routing).

I am aware that this is not recommended by SAP.

 

The issue is that my phantom BOM PDS changes are no longer transferred to APO via CIF because there is a Production Version existing.

SAP HELP statement on BOM in CFM1

Material BOM in Integration Model

 

If you set this indicator, all bills of material that correspond to the
stated selection options are indcluded in your model.

 

Dependencies

 

The material BOM filter object can only be used in connection with the
production data structure (iPPE) and it is used to map phantom assemblies.

 

Only those bills of material are transferred for materials for which no
production production versions have been created.

 

I was wondering if anyone else had a similar requirement and how they resovled it.

 

My idea is to use a CIF enhancement during CIF of the BOM PDS and make the system think that there is no production version.

 

Any other ideas.

 

Thanks

Kumar


Viewing all articles
Browse latest Browse all 2032

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>