Hi ,
The demands are on the 06th and since there is a fixing interval of 2 days , I would expect when I reschedule it should schedule as close to the demands as possible i.e., on the 8th (since there are slots available).
The DS strategy has only forward and backward for rescheduling.
As you can see there is an overload:(Demands are on the 11th), planned orders are available on the 15th as there is a planning time fence
DS Strategy : Backward
Result:Backward Re-scheduling
Result: Forward Re-scheduling
Please shed some light on this .
Thanks,
Rajan