Hello Tanveer,
I checked those parameters and seems that everything is fine.
Safety stock is cero
ATR and ATI are maintained with the standard ATP categories
the pull deployment horizon is 999.
there is something wrong with the real time, because if I run the deployment based on Last SNP run, it confirm the correct quantity to the DC.
Thanks
Beatriz