Hi ,
We have CIFed recipes with classes(work center class 019) assigned to operations and have alternate resources (as alternate modes) in the PPDS PDS. Both the modes have the same fixed and variable capacity consumption, is there a way to change the capacity consumption rates for the alternate resource?
Please shed some light on this.
Thanks,
Rajan.