PP/DS optimizer creates unnecesary gap when considering secondary resource

$
0
0

Hello experts,

 

I have the following scenario

 

Materials:

     HALB: 157943

     FERT: 157944

 

Resources

     LIN_BAS

     PRO_BAS

     CarboC

    

The recipe for the FERT consumes the HALB in LIN_BAS and uses a secondary resource called CARBOC during the entire process. The Halb is produced in PRO_BAS.

 

The issue is that when we run the optimizer it delays the FERT order for a period of time equal to the time it uses the CARBOC. For example: the FERT order lasts 8 hours and the CARBOC is used during those 8 hours  So if the HALB order finnishes at 18:00, the FERT order starts until 2:00 of the next day. This happens even when there is only one order for the FERT. I attached an image with the optimizer results.

 

What possible explanation could there be for this?