Thanks Kenneth,
Actually I asked SAP, and my question is simple ( 5 days my Shelf Life, and I have surplus with 330, and my Storage Cost is 0.010 and my procurement cost is 1.0 in product master,,
so when I run the Optimizer I see the Penalty Cost is more than 1 million, from where this one million and how its calculated ?
and I used hard constraint in Optimizer Profile, which dispose the expired products, and the optimizer also used some of these supply to cover some demands, after the 5 days of Shelf Life how, which is not correct ?
Alexander