Quantcast
Viewing all articles
Browse latest Browse all 2032

MRP Contoller in APO Product Master

Hello Experts,

 

Can MRP Controller get populate as production planner in APO Product Master when Materials are CIFed to APO ?

 

I tried Prog. RIMODINI for Materials and the production planner filed was not populated.

 

I do not want to maintain production planner manually in APO.

 

Is there a specific note on how MRP controler can be populated via CIF as standard ?

 

Regards

Alin


Viewing all articles
Browse latest Browse all 2032

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>