Hello Experts,
Can MRP Controller get populate as production planner in APO Product Master when Materials are CIFed to APO ?
I tried Prog. RIMODINI for Materials and the production planner filed was not populated.
I do not want to maintain production planner manually in APO.
Is there a specific note on how MRP controler can be populated via CIF as standard ?
Regards
Alin