Hi,
There is Manufacturing plant and DC.
T Lane exists between this two from Plant to DC.
There is demand sitting at DC and we run Heuristic at DC. This demand is not passing as requirement to Plant.
What could be the reason? Do I need to check some settings?
Regards,
Prabhat