Dear Nikhil & Abhishek,
Thanks for your reply. I have been able to create TLB order using T.Zone after maintaining Transportation Relevant Hierarchy Structure.
As expected, the system created 2 STOs - first one from A-->B and second from A-->C. These 2 STOs will go in the same truck. My question is that if there are more than one truck planned between A and Transportation Zone (consisting of Location B & C) then during execution, how will the planner know which STOs will go in a particular truck. Eg - if TLB generates 4 truck loads, then during integration, system will create 8 STOs. So how can we know which STOs are paired together for shipment.
Thanks again for your earlier replies.
Beat regards,
Sameer