Hello,
SNP heuristic does not consider the self life data.
PP heuristic SAP_PP_SL001 Planning of Std Lots with Shelf Life is delivered in standard takes account of the shelf life conditions as the "Planning with shelf life" indicator is set. Other heuristics do not take account of the shelf life conditions.
Best Regards,
R.Brahmankar