Hi SDN team,
with respect to this rrp4 screen below ; It would be a good idea though to cross check with you if my interpretation with respect to first row is rite !
javascript:;the system has made available on time 19:27 a receipt/ supply called planned order (Plord )against the number 333795566 with a quantity 1 for the product SFT25MZB7R7A7WH and this receipt will be consumed by the requirements.
then intriguing point is ; I see
1..confirmed quantity =0 and requirement quantity =0 (how do i correlate with that with the above statement )
2. when all are plord. then why there is a special mention of SNP:PL-ORD.in the bottom of the screen
Would like to know the interpretation from you in this regard as it is intriguing??
thanks
Rahul Ohio