Hello,
In the material master Always collective requirements have to be choose. The horizon forward/backward of the consumption mode 2 have to cover the desired horizon (Forecast/SO)
Also check the category of the SO and then check the strategy 20 to see if the SO order category is take in consideration.
Thanks,
Regards, Marius